Where current is converted
A battery charges with direct current. In AC charging, the external equipment supplies alternating current and the onboard charger performs conversion. A 22 kW point therefore does not guarantee 22 kW in the vehicle. DC converts externally and supplies direct current within vehicle-negotiated limits.
On a balanced 400 V three-phase supply, 16 A per phase is about 11 kW and 32 A about 22 kW at near-unity power factor. A van using only one phase does not automatically use all that power. DC power is also constrained by voltage and cable current.
AC/DC conversion
Functional schematic. Protection and communications omitted to highlight conversion.
Same energy, different windows
Assume 36 battery kWh to replenish. At 90% efficiency this needs 40 grid kWh. At 11 kW AC it takes at least 3 h 38 min; at 50 kW effective DC grid input, 48 minutes. These are idealised constant-power minima without high-SOC tapering.
| Criterion | AC | DC |
|---|---|---|
| Typical window | Hours | Minutes to hours |
| Conversion | Onboard | External unit |
| Investment per bay | Usually lower | Usually higher |
| Operational risk | Onboard charger limit | Shared power, curve and rotations |
What happens on a constrained supply
At 100 kW net with four hours of dwell, the depot has at most 400 grid kWh. A 400 kW DC unit does not change that limit. It can change how energy is distributed and when, but not the aggregate balance without changing power or dwell time.
A mixed architecture can help: AC on overnight bays and DC for double shifts, late returns or opportunity charging. Also size the case where the only DC unit is unavailable. Compare electrical works, maintenance, expandability and energy costs as well as purchase price.