1. From kilometres to grid energy
Each vehicle uses 33.6 battery kWh in the example. Twenty vehicles need 672 kWh. Divide by 0.90 to include charging losses (746.7 kWh) and add a 15% design margin (858.7 kWh). The margin is not necessarily billed energy every night.
If the building has 125 kW available at its supply point but uses 35 kW during the window, net charging power is 90 kW, provided the electrical installation can deliver it. Do not confuse contracted power with instantaneous effective power.
2. Power, connectors and acceptance
Useful power is constrained by grid, installed equipment and what connected vehicles accept. Twenty 11 kW points cannot deliver 220 kW if the depot has 90 kW. A 22 kW point will not deliver that power to a van with an 11 kW onboard charger either.
One point per vehicle allows sharing without moving them. Ten connectors for twenty vans and a positive aggregate balance only show that energy could fit; bay rotations are needed. The earliest departure can be more restrictive than total energy.
Example: five 11 kW vehicles connected at a depot with 100 kW net and 220 kW installed.
3. Size your installation
Enter net power after building loads. In this homogeneous calculation every vehicle accepts at most the specified power and shares a common window. You can compare a connector failure with normal operation; individual schedules are not optimised.
Size your scenario
- Daily battery energy per vehicle
- 33.6 kWh
- Average power required
- 85.9 kW
- Vehicles connected at once
- 20
- Theoretical maximum vehicles served
- 20
- Effective grid power
- 90 kW
- Energy capacity utilisation
- 95.4 %
- Capacity without failures
- 900 kWh
Without rotations, only vehicles with a connectable bay can be served.
Assumptions: 90% efficiency, 15% design margin, constant power. Bounds are necessary, not sufficient to validate a schedule.
Technical result (JSON)
{
"schemaVersion": 1,
"tool": "depot",
"inputs": {
"vehicles": 20,
"km": 120,
"consumption": 28,
"hours": 10,
"power": 90,
"connectors": 20,
"chargerKw": 11,
"acceptKw": 11,
"failed": 0,
"rotations": 0
},
"defaultedInputs": [],
"results": {
"consumption": 28,
"energy": 33.6,
"required": 858.6666666666665,
"recoverable": 900,
"gap": 41.333333333333485,
"normalCapacity": 900,
"average": 85.86666666666665,
"active": 20,
"vehicleBound": 20,
"gridPower": 90,
"utilization": 95.40740740740739,
"feasible": 1,
"tight": 1,
"individualEnough": 1
},
"assumptions": {
"efficiencyPct": 90,
"designMarginPct": 15,
"model": "aggregate energy bounds; no individual schedule or vehicle certification",
"vending": "incremental rolling resistance only; peak and mean loads separate",
"battery": "capacity-based SOH; energy criterion only; no safety or warranty assessment"
},
"documentation": "https://www.autonality.ai/ai/fleet-intelligence.md"
}4. Before investing
Collect site load profiles and actual return/departure times. Check vehicle acceptance, safe bay access and whether management can prioritise departures. Obtain an electrical design from a qualified engineer and simulate peak nights, not just a weekly average.