How to charge 20 electric vans at a depot

Calculate energy, power and connectors separately. Contracted power is only part of the problem.

In brief

Twenty vans driving 120 km daily at 28 kWh/100 km need 858.7 design grid kWh at 90% efficiency and 15% margin. Over ten hours that is 85.9 kW on average. This alone does not determine connector count.

1. From kilometres to grid energy

Each vehicle uses 33.6 battery kWh in the example. Twenty vehicles need 672 kWh. Divide by 0.90 to include charging losses (746.7 kWh) and add a 15% design margin (858.7 kWh). The margin is not necessarily billed energy every night.

If the building has 125 kW available at its supply point but uses 35 kW during the window, net charging power is 90 kW, provided the electrical installation can deliver it. Do not confuse contracted power with instantaneous effective power.

2. Power, connectors and acceptance

Useful power is constrained by grid, installed equipment and what connected vehicles accept. Twenty 11 kW points cannot deliver 220 kW if the depot has 90 kW. A 22 kW point will not deliver that power to a van with an 11 kW onboard charger either.

One point per vehicle allows sharing without moving them. Ten connectors for twenty vans and a positive aggregate balance only show that energy could fit; bay rotations are needed. The earliest departure can be more restrictive than total energy.

Three limits, one effective power
Available grid100 kW
Installed chargers220 kW
Vehicle acceptance55 kW
55 kWEffective limit: vehicles

Example: five 11 kW vehicles connected at a depot with 100 kW net and 220 kW installed.

3. Size your installation

Enter net power after building loads. In this homogeneous calculation every vehicle accepts at most the specified power and shares a common window. You can compare a connector failure with normal operation; individual schedules are not optimised.

Interactive calculator

Size your scenario

Operation
Charging and infrastructure
Tight margin: check schedules and peaks
Design grid energy858.7 kWh
Grid charging capacity900 kWh
Energy balance41.3 kWh
Daily battery energy per vehicle
33.6 kWh
Average power required
85.9 kW
Vehicles connected at once
20
Theoretical maximum vehicles served
20
Effective grid power
90 kW
Energy capacity utilisation
95.4 %
Capacity without failures
900 kWh

Without rotations, only vehicles with a connectable bay can be served.

Assumptions: 90% efficiency, 15% design margin, constant power. Bounds are necessary, not sufficient to validate a schedule.

Technical result (JSON)
{
  "schemaVersion": 1,
  "tool": "depot",
  "inputs": {
    "vehicles": 20,
    "km": 120,
    "consumption": 28,
    "hours": 10,
    "power": 90,
    "connectors": 20,
    "chargerKw": 11,
    "acceptKw": 11,
    "failed": 0,
    "rotations": 0
  },
  "defaultedInputs": [],
  "results": {
    "consumption": 28,
    "energy": 33.6,
    "required": 858.6666666666665,
    "recoverable": 900,
    "gap": 41.333333333333485,
    "normalCapacity": 900,
    "average": 85.86666666666665,
    "active": 20,
    "vehicleBound": 20,
    "gridPower": 90,
    "utilization": 95.40740740740739,
    "feasible": 1,
    "tight": 1,
    "individualEnough": 1
  },
  "assumptions": {
    "efficiencyPct": 90,
    "designMarginPct": 15,
    "model": "aggregate energy bounds; no individual schedule or vehicle certification",
    "vending": "incremental rolling resistance only; peak and mean loads separate",
    "battery": "capacity-based SOH; energy criterion only; no safety or warranty assessment"
  },
  "documentation": "https://www.autonality.ai/ai/fleet-intelligence.md"
}

4. Before investing

Collect site load profiles and actual return/departure times. Check vehicle acceptance, safe bay access and whether management can prioritise departures. Obtain an electrical design from a qualified engineer and simulate peak nights, not just a weekly average.