Contact
Tractor unit · N3

MAN eTGX

Modular electric tractor: distinguish the six-pack configuration delivered in 2024 from the evolution unveiled in 2026.

Manufacturer specification and photos ↗
4×2 tractor with three-axle trailer
6 packs · 2024 delivery
534 kWh
Usable · 2024 delivery
480 kWh
New battery · IAA 2026
88 kWh/pack
In brief

The MAN eTGX change between generations is more than a range headline: six packs in the 2024 reference provide 480 usable kWh, while six packs in the generation announced in 2026 would total 528 usable kWh. On the 320 km example, that difference changes a shortfall into headroom. The charging schedule remains just as important.

Generation matters

MAN documented a 2024 delivery with six packs, 534 gross and 480 usable kWh. At IAA 2026 it unveiled a new eTGX with 92 gross and 88 usable kWh per pack. Six new-generation packs total 528 usable kWh arithmetically, not 480. The manufacturer also announces a seven-pack configuration for the new 6x2-4. A model unveiling does not confirm delivery timing for a particular order.

Six packs: usable energy

Documented 2024 delivery480 kWh
Evolution unveiled 2026528 kWh

What changes on the mission

A 320 km route at an assumed 110 kWh/100 km needs 352 kWh. At 95% departure, 15% reserve and 90% SOH, 480 initial usable kWh leave 345.6 kWh; 528 leave 380.2. That difference can change a route outcome. It is not a prediction of real consumption: trailer, elevation, combination mass and speed must be included in a trial.

CCS, MCS and availability

MAN quotes up to 375 kW CCS for the eTGX. Replenishing 352 kWh in one hour would require an average of at least 352 kW at the battery. A 375 kW peak leaves little room if charging power tapers. For route planning, energy actually delivered across the required SOC window is more useful than the largest number on the data sheet; bay availability and access for the articulated truck further constrain the stop.

The depot impact

Eight tractors replenishing 300 kWh each overnight need 2,400 kWh in their batteries. Over nine hours at 90% efficiency this is about 296 kW average grid power before margins. Size connections and assess actual arrival times too.

Why battery pack placement matters

MAN locates high-voltage packs in different chassis areas depending on the configuration and offers an optional ePTO interface. Their position is not just a packaging detail: it affects space for auxiliary equipment and can influence axle and fifth-wheel arrangements. Two tractors with the same pack count may therefore behave differently when coupled to a trailer or powering ancillary equipment. The complete vehicle architecture matters as much as the kWh total.

A higher-energy version may suit routes without intermediate charging, but a larger battery does not automatically increase freight capacity. In weight-limited operations, compare tonnes delivered per day. In volume-limited operations, compare the trips possible with the same trailer. These two metrics let you value an extra pack against actual work rather than catalogue range.

Battery capacity versus depot power

Suppose the eight tractors in the earlier example return with a SOC difference equivalent to 300 kWh each and can connect simultaneously. Minimum average grid power was 296 kW over nine hours. If four return two hours later, each of those four has just seven hours and needs an average 47.6 kW of grid power instead of 37.0 kW. Aggregate power of 296 kW may still suffice if allocated well, but eight equal shares are no longer sufficient. Use the first two hours for the trucks already present and prioritise earlier departures.

To size the connection, distinguish the maximum demand of one tractor, the simultaneous maximum the installation can supply, and average demand in each window. A larger battery does not require more daily replenishment if the work is identical, but may change the energy needed after an exceptional day. Include that case and a failed connector before approving the investment.

Further reading

Autonality

Apply these criteria to your own fleet

Assess vehicles, routes and charging together before investing.