Two battery strategies
Ford offers E-Transit with 68 and 89 usable kWh. Iveco uses 37 kWh installed modules, up to four depending on variant. The figures use different bases and should not be placed in a direct range ranking. If you need a 3.5 t panel van, first request variants compatible with that limit; eDaily’s 148 kWh maximum does not mean that it is available in that van.
Sizing for a common mission
Consider an illustrative 140 km route at 30 kWh/100 km plus 5 auxiliary kWh: 47 kWh demand. With 90% departure, 15% reserve and 90% SOH, minimum initial usable capacity is 69.6 kWh. Ford’s 68 falls short; 89 fits. Two Iveco packs total 74 installed kWh but must provide at least 69.6 usable kWh; confirm that. One pack cannot meet the example.
Required usable capacity versus Ford options
Iveco is omitted from this chart because exact usable capacities have not been confirmed here.
What a body conversion changes
In a panel van, volume and payload are largely defined by the commercial version. On a chassis with a box, tail lift or refrigeration unit, each conversion changes vehicle mass, axle loads and auxiliary energy demand. eDaily’s modular approach gives more battery-and-chassis combinations to resolve these trade-offs; E-Transit has a more limited battery offer but also includes conversion variants. The useful comparison is between two finished vehicles capable of the same job.
Size the job, not just the purchase
If each of two rounds needs 47 kWh and the battery initially has 89 usable kWh, checking just one round is not enough. Calculate remaining energy on return, how much can be recovered during loading, and whether every vehicle can connect simultaneously. Special conversions also require checking equipment supply and duty cycles.
When a modular architecture makes sense
A fleet of panel vans on similar routes can benefit from standardising two battery configurations and keeping vehicles interchangeable. That differs from a company running tail lifts, tippers, mobile workshops and refrigerated vehicles, where body weight and energy vary widely. eDaily’s modularity allows more combinations to be assessed, but also requires knowing which modules each chassis supports. E-Transit should not be ruled out for conversions either: compare chassis-cab versions and approved interfaces that meet the work requirements.
Future modularity is valuable only if a battery expansion is supported for the chassis and available as an authorised, economically reasonable operation. If more energy requires costly changes to approval, weights, software or hardware, the theoretical flexibility may be of little practical use. It matters most when specifying new special-purpose vehicles, rather than assuming any eDaily can simply add packs years later.
Compare the cost of work, not just the vehicle
Suppose one equipped configuration can carry 1,100 kg per trip and another only 950 kg. A divisible 2,100 kg order can take two trips in the first and three in the second. If each round adds 45 km, that is 45 km and an additional loading, unloading and driver cycle. At 30 kWh/100 km it adds 13.5 kWh of traction energy before other loads. These are hypothetical values, not Ford or Iveco payloads. Productivity loss can outweigh a small efficiency difference between quotes.
In a leasing quote, compare annual fee, grid energy cost, driver time, maintenance work and replacement vehicle arrangements. For conversions, include body cost, lifetime and whether it can be reused when the fleet is renewed. Express the result as cost per completed service, delivered tonne or productive kilometre, depending on the business. That lets you compare Iveco’s modularity with Ford’s battery approach without assuming one architecture is always superior.